CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Footbridge across Po Yap Road linking Tseung Kwan O Area 55 and Area 65

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-13.html
查看原文摘錄
Major Projects - Footbridge across Po Yap Road linking Tseung Kwan O Area 55 and Area 65 Footbridge across Po Yap Road linking Tseung Kwan O Area 55 and Area 65 Project Number: 7160TB Brief Description of Project Scope: This project is to provide a footbridge across Po Yap Road to connect Tseung Kwan O Area 65 to Area 55 so that Area 65 will be connected with the future grade-separated pedestrian network serving Tseung Kwan O Areas 55, 56, 57, 59 and 66. The project comprises construction of: a covered footbridge of approximately 32m long and 5m clear width linking "Bauhinia Garden" in Area 65 and "The Grandiose" in Area 55; lift facilities; and associated footpath, cycle track, drainage, landscape and E&M works. Cost: $80.5 million Completion Date: 13 September 2016 Project Office in Civil Engineering and Development Department: East Development Office Back