CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Trunk Road T2 and Cha Kwo Ling Tunnel

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-31.html
查看原文摘錄
Major Projects - Trunk Road T2 and Cha Kwo Ling Tunnel Trunk Road T2 and Cha Kwo Ling Tunnel Project Number: 7785TH Brief Description of Project Scope: The scope of the project comprises:- (a)          a dual two-lane trunk road of approximately 3.4 km length, 3.1 km of which are in the form of tunnels; (b)          two ventilation buildings; (c)          associated buildings, civil, structural, landscaping, electrical and mechanical works; (d)          associated traffic control and surveillance system; and (e)          ancillary works, environmental mitigation measures and environmental monitoring and audit (EM&A). Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7111) Consultant: Hyder-Meinhardt Joint Venture Approved Project Estimate: $16.017 billion Related Website: https://www.trunkroadt2.hk/eng/ Status: Under construction Current Progress: The works commenced on 14 November 2019. Contract: Contract No. ED/2018/04 Scope: Same as project scope items (a), (b), (c) and (e) above Commencement Date: 14 November 2019 Completion Date: 2026 Contract Sum: $10.918 billion Contractor: Bouygues Travaux Publics Contract No. ED/2020/03 Scope: Same as project scope item (d) above Commencement Date: 28 January 2022 Completion Date: 2026 Contract Sum: $203.80 million Contractor: GTECH Services (Hong Kong) Limited Other Related Information: https://www.trunkroadt2.hk/eng/intro.php Back