Major Projects - Advance Site Formation and Engineering Infrastructure Works at Kwu Tung North and Fanling North New Development Area
Advance Site Formation and Engineering Infrastructure Works at Kwu Tung North and Fanling North New Development Area
Project Number:
7747CL
Brief Description of Project Scope:
The project is part of the first phase of the Kwu Tung North (KTN) and Fanling North (FLN) New Development Area (NDA) development and comprises mainly:
site formation of about 70 hectares ("ha") of land (including soil treatment works) in the KTN and FLN NDA;
construction of the Fanling Bypass (Eastern Section) of about 4 kilometres ("km") long, which is a dual two‐lane carriageway connecting the FLN NDA to Fanling Highway, about 10 km of local roads and about 10 km of footpaths, and about 4 km cycle tracks within the NDA area, and associated junction/road improvements;
engineering infrastructure works including drainage, sewerage (including two sewage pumping stations), waterworks (including a fresh water service reservoir of about 27 500 cubic metres ("m
3
") capacity and a flushing water service reservoir of about 11 500 m
3
capacity in the KTN NDA), landscaping works and slopeworks;
part expansion and upgrading of Shek Wu Hui Sewage Treatment Works ("SWHSTW") to increase its treatment capacity by 20 000 m
3
per day;
reprovisioning works; and
implementation of environmental mitigation measures and environmental monitoring and audit ("EM&A") programme for the works mentioned in paragraphs (a) to (e) above.
Project Office in Civil Engineering and Development Department:
North Development Office (Enquiry: 3547 1624)
Consultant:
AECOM Asia Company Limited
Approved Project Estimate:
$17.32 Billion
Related Website:
http://ktnfln-ndas.gov.hk/en/index.php
Current Progress:
Construction commenced in September 2019
Contract:
Contract no. ND/2019/06
Scope:
The contract mainly comprises construction of an in-situ reprovisioned NDTWM and its facilities involving a steel canopy for the trading area and a management office building.
Commencement Date:
27 September 2019
Completion Date:
17 March 2022 (Actual Completion)
Contract Sum:
$232 Millions
Contractor:
New Concepts Engineering Development Limited
Contract No. ND/2019/01
Scope:
The works mainly comprise site formation of land under the First Phase of KTN NDA (including soil treatment works); construction of engineering infrastructures including drainage works, sewerage works (including temporary sewage treatment facilities), waterworks (including a fresh water service reservoir and a flushing water service reservoir), roadworks (including carriageway, footpaths, cycle tracks, a subway and junction improvement), pipeworks for district cooling system, slope works and landscaping works; and construction of associated environmental mitigation works including noise barriers/noise enclosures and low noise road surfacing.
Commencement Date:
6 December 2019
Completion Date:
2026
Contract Sum:
$3053 Millions
Contractor:
Build King - Richwell Engineering Joint Venture
Enquiry:
5975 8579
Contract No. ND/2019/02
Scope:
The contract mainly comprises road and drainage works between Kwu Tung North New Development Area and Shek Wu Hui; construction of a sewage pumping station, a Long Valley Nature Centre and a footbridge spanning across Sheung Yue River; and site formation of land and the associated engineering infrastructure works for a village resite area in Kwu Tung North New Development Area.
Commencement Date:
17 February 2020
Completion Date:
2026
Contract Sum:
$1040 Millions
Contractor:
Chun Wo - Kwan Lee Joint Venture
Enquiry:
6846 0156
Contract No. ND/2019/05
Scope:
The contract mainly comprises construction of an approximately 2 kilometres (km) long dual two-lane Fanling Bypass Eastern Section between Shung Him Tong and Kau Lung Hang mainly on viaducts with two long span overbridges across the existing East Rail Line; realignment of part of the existing Tai Wo Service Road East, Tai Wo