Kai Tak development – reconstruction and upgrading of Kai Tak Nullah

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-45.html
查看原文摘錄
Major Projects - Kai Tak development – reconstruction and upgrading of Kai Tak Nullah Kai Tak development – reconstruction and upgrading of Kai Tak Nullah Project Number: 7167CD Brief Description of Project Scope: (a) reconstruction and upgrading of Kai Tak Nullah of about 1 300 metres (m) long at the north apron area of the former Kai Tak Airport from Prince Edward Road East to Kai Tak Approach Channel into a combination of a drainage channel and multi-cell box culverts with a total width varying from about 40m at the upstream to about 70m at the downstream; (b) construction of two enclosed desilting compounds with vehicular access; and (c) ancillary works including landscaping works, environmental mitigation measures and related monitoring and audit works. Cost: $2.488 billion Completion Date: April 2018 Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7114) Back