CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Kai Tak development – Stage 3A & Stage 4 基礎設施 works at north apron area of Kai Tak Airport

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-47.html
查看原文摘錄
Major Projects - Kai Tak development – Stage 3A & Stage 4 infrastructure works at north apron area of Kai Tak Airport Kai Tak development – Stage 3A & Stage 4 infrastructure works at north apron area of Kai Tak Airport Project Number: 7761CL Brief Description of Project Scope: Stage 3A - infrastructure comprises the construction of the following major items: new roads about 890 metres (m) in total length covering L1, Road L11 and a slip road linking Prince Edward Road East (PERE) to Road D1; a vehicular underpass about 225m long across PERE forming part of Road L1; a new pedestrian subway of about 205m long, and extension of an existing subway about 60m in total length, across PERE; modification and widening of existing roads in former Kai Tak Airport north apron area and San Po Kong area; associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping works and electrical and mechanical works; and provision of necessary environmental mitigation measures and implementation of an environmental monitoring and audit programme associated with the above works. Stage 4 - infrastructure comprises the construction of the following major items: construction of about 1 630m long of new roads covering part of Road D2, Road L6 and Road L19; reconstruction and widening of sections of existing footpaths at Sung Wong Toi Road and To Kwa Wan Road; construction of two sewage pumping stations, about 2 000m long of twin rising mains and 2 300m long of gravity sewer; construction of stormwater drains including about 3 600m long of road drains and 430m long of box culverts; associated footpaths, street lighting, traffic aids, water mains and landscaping works; and provision of necessary environmental mitigation measures and implementation of an environmental monitoring and audit programme for the works associated with the above works. Cost: $2.255 billion Completion Date: June 2017 (Stage 3A) and March 2019 (Stage 4) Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7114) Back