CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Kai Tak development – 基礎設施 works for developments at the southern part of the former runway

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-50.html
查看原文摘錄
Major Projects - Kai Tak development – infrastructure works for developments at the southern part of the former runway Kai Tak development – infrastructure works for developments at the southern part of the former runway Project Number: 7711CL Brief Description of Project Scope: The scope of Stage 2 comprises: construction of the following items of works mainly located at the former runway – (i) realignment and widening of the existing single 2-lane Shing Fung Road to form a dual 2-lane distributor road of about 1.4 kilometres (km) long; (ii) associated single 2-lane roads (including a vehicular underpass) with a total length of about 0.6 km branching off from the realigned Shing Fung Road to the sites along the road; (iii) an elevated landscaped deck with lifts and staircases of about 1.4 km long with minimum 11 metres (m) in width above the realigned Shing Fung Road serving as part of a semi-enclosure noise barrier and also as a public open space; and (iv) roadside noise barriers with a total length of about 1.1 km long alongside the realigned Shing Fung Road and integrated with the elevated landscaped deck; upgrading of the existing single 2-lane carriageway of about 0.3 km long on Kai Tak Bridge to a dual 2-lane carriageway; improvement to three existing road junctions along Wang Chiu Road at its junctions with Kai Cheung Road, Lam Hing Street and Sheung Yee Road in Kowloon Bay; construction of associated footpaths, pedestrian streets, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned above. The scope of Stage 3 comprises: construction of the following items of works located at the former south apron area – (i) reconstruction and widening of Shing Cheong Road and part of Cheung Yip Street from the existing single 2-lane roads to form dual 2-lane roads with a total length of about 0.7 km; and (ii) construction of a supporting underground structure of about 0.4 km long along Shing Cheong Road and across Cheung Yip Street as enabling works to facilitate future construction of Trunk Road T2; construction of associated footpaths, pedestrian streets, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned above. Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 2301 1393) Consultant: AECOM Asia Company Limited; and Hyder-Meinhardt-Jo Approved Project Estimate: $5.757 billion Current Progress: The Stage 2 works commenced on 30 November 2015 and the Stage 3 works commenced on 23 November 2015. The delivery of both stages of works is on schedule. Contract: Contract No. KL/2014/01 Scope: same as project scope for the Stage 2 above Commencement Date: 30 November 2015 Completion Date: completion in phases between Early 2018 and 2019 Contract Sum: $1.947 billion Contractor: CEC – CCC Joint Venture Contract No. KL/2014/03 Scope: same as project scope for the Stage 3 above Commencement Date: 23 November 2015 Completion Date: end 2019 Contract Sum: $2.176 billion Contractor: China Road and Bridge Corporation Other Related Information: Gazette Date Subject 16 May 2014 and 23 May 2014 Scheme G.N.2786 Plan(s) 60022408/S2/2.1 16 May 2014 and 23 May 2014 Scheme G.N. 2790 Plan(s) 60022408/S2/1.1 60022408/S2/1.2 60022408/S2/1.3 22 August 2014 and 29 August 2014 Scheme G.N.4780 Plan(s) 60022408/S3/1.2 29 August 2014 and 5 September 2014 Authorization of Scheme G.N.4930 29 August 2014 and 5 September 2014 Authorization of Scheme G.N.4932 28 November 2014 and 5 December 2014 Authorization of Scheme G.N.6774 Back