CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Kai Tak development – stages 3B and 5A 基礎設施 works at former north apron area

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-51.html
查看原文摘錄
Major Projects - Kai Tak development – stages 3B and 5A infrastructure works at former north apron area Kai Tak development – stages 3B and 5A infrastructure works at former north apron area Project Number: 7797CL Brief Description of Project Scope: The scope of Stage 3B infrastructure works comprises the following major items: construction of a section of dual two-lane Road L2 of about 320 metres (m) long connecting Shing Kai Road with Concorde Road, and a pair of single-lane slip roads of about 650 m long linking the eastbound Prince Edward Road East (PERE) with San Po Kong; construction of an elevated landscaped walkway LW4 of about 290 m long across PERE connecting San Po Kong and Kai Tak Development (KTD); demolition of existing flyover K9 in San Po Kong across PERE; construction of a pedestrian subway SW4 of about 180 m long across PERE, Kwun Tong Bypass and Shing Kai Road connecting Choi Hung Estate and KTD; road modification works in San Po Kong area; construction of associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and related environmental monitoring and audit (EM&A) programme. The scope of Stage 5A infrastructure works comprises the following major items: construction of a single two-lane Road L7 of about 140 m long and a section of dual two-lane Road D1 of about 470 m long connecting with Concorde Road; construction of a single-lane slip road S15 of about 160 m long linking the proposed Road D1 with existing flyover K72 for connection with PERE eastbound; construction of a pedestrian subway SW6 of about 120 m long across PERE connecting the future preservation corridor for the Lung Tsun Stone Bridge remnants in KTD and Shek Ku Lung Road Playground; construction of associated footpaths, street lighting, traffic aids, drainage including about 830 m long box culverts, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and related EM&A programme. Cost: $2.152 billion Completion Date: January 2022(Stage 3B) and October 2022(Stage 5A) Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7108) Back