Improvement works at Mui Wo

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-52.html
查看原文摘錄
Major Projects - Improvement works at Mui Wo Improvement works at Mui Wo Project Number: 7414RO Brief Description of Project Scope: Phase 1 Construction of a segregated pedestrian walkway and cycle track of about 230 metre (m) long and 11.5 m wide along the waterfront between Mui Wo Cooked Food Market and River Silver; Construction of a footbridge of about 35 m long and 4.8 m wide across River Silver; Construction of a civic square near Mui Wo old town with associated landscaped area, recreational and leisure facilities and a performance venue; Construction of seven amenity areas in villages at Mui Wo; and Ancillary works including signage, landscaping, drainage and utilities works. Phase 2 Stage 1 Realignment of a section of Mui Wo Ferry Pier Road and extension of existing car parking area ; and Ancillary works including slope works, signage, landscaping, drainage and utility works. Phase 2 Stage 2 Construction of a two-storey joint-user building with a total construction floor area of about 8,500 m 2 at the north of Mui Wo Ferry Pier (the Pier), in order to reprovision the existing cooked food market, dry goods stalls, public toilet, refuse collection point and public cycle parking area; provide an additional public car parking area, a podium garden and an outdoor dining area; Construction of a waterfront promenade of about 130 m long and 6 m wide at the north of the Pier; Construction of a waterfront promenade of about 200 m long and 4 m to 9 m wide at the south of the Pier, and provision of additional public cycle parking spaces and public car parking spaces along the promenade; Construction of an entrance plaza of about 1,700 m 2 at the west of the entrance of the Pier, reprovision of the bus terminus and taxi stand near the entrance plaza, and provision of additional public cycle parking spaces and public car parking spaces; Construction of a cycle track of about 400 m long; Construction of a cargo loading and unloading area with parking spaces for goods vehicles and coaches; and Implementation of landscaping and other ancillary works. Phase 3 Improvement works for the heritage trails in Mui Wo. Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office (Enquiry: 2231 4408) Consultant: Jacobs China Limited Approved Project Estimate: $193 million (for phase 1 works) $72 million (for phase 2 stage 1 works) $897 million (for phase 2 stage 2 works) Related Website: https://www.facelift-muiwo.com Status: Phase 1 Construction works commenced in July 2014 and completed in June 2017. Phase 2 Stage 1 Construction works commenced in July 2016 and completed in March 2019. Phase 2 Stage 2 Construction works commenced in May 2023 and is expected to be completed in 4.5 years. Phase 3 Under planning and the scope is being reviewed. Current Progress: Phase 2 Stage 2 Construction in progress. Phase 3 Under planning and the scope is being reviewed. Other Related Information: https://facelift-muiwo.com/eng/Download%20Remaining.html Back