CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Liantang/Heung Yuen Wai Boundary Control Point and associated works - site formation and 基礎設施 works

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-55.html
查看原文摘錄
Major Projects - Liantang/Heung Yuen Wai Boundary Control Point and associated works - site formation and infrastructure works Liantang/Heung Yuen Wai Boundary Control Point and associated works - site formation and infrastructure works Project Number: 5019GB Brief Description of Project Scope: The project mainly comprises site formation of about 23 hectares of land for provision of Boundary Control Point (BCP) buildings and associated facilities, construction of about 11km long dual 2-lane Connecting Road linking up the BCP with Fanling Highway, design and construction of the Hong Kong Special Administrative Region portion of vehicular bridges and pedestrian bridge crossing Shenzhen River, associated diversion/modification works at existing local roads and junctions, drainage, sewerage, waterworks and landscaping works. Cost: $21 billion Completion Date: April 2019 Project Office in Civil Engineering and Development Department: North Development Office (Enquiry : 3547 1624) Environmental Monitoring and Audit Information: http://www.lthywbcpema.com Back