CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Tseung Kwan O – Lam Tin Tunnel

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-65.html
查看原文摘錄
Major Projects - Tseung Kwan O – Lam Tin Tunnel Tseung Kwan O – Lam Tin Tunnel Project Number: 7823TH Brief Description of Project Scope: The project is for the construction of a dual two-lane highway approximately 3.8 km long connecting Tseung Kwan O (TKO) at Po Shun Road in the east with proposed Trunk Road T2 in Kai Tak Development in the west. About 2.2 km of the highway is in the form of tunnel. Tseung Kwan O – Lam Tin Tunnel (TKO-LTT) will meet the TKO external traffic demand as a result of continual development of TKO. TKO-LTT, together with the proposed Trunk Road T2 and Central Kowloon Route, will form the Route 6 which will provide an east-west express link between West Kowloon and TKO areas. Cost: $15.1 billion Completion Date: December 2022 Project Office in Civil Engineering and Development Department: East Development Office (Enquiry : 3842 7129) Back