CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Improvement works at Tai O

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-66.html
查看原文摘錄
Major Projects - Improvement works at Tai O Improvement works at Tai O Project Number: 7417RO Brief Description of Project Scope: Phase 1 works include: i. Construction of a riverwall at Yat Chung and the associated drainage and sewerage improvement works; ii. Upgrading of the temple garden in front of Kwan Tai Temple; and iii. Improvement to the signage within the inner-core area of Tai O. Phase 2 Stage 1 works include: i. Construction of a public open space, a public transport terminus, a public car park for private cars, a loading and unloading area, a cycle parking area and associated roadworks at the western end of Tai O Road; ii. Provision of on-street parking spaces for coaches and goods vehicles at Lung Shing Street in Yim Tin; and iii. Landscaping and ancillary works. Phase 2 Stage 2 works include: i. Construction of footbridges at Po Chue Tam and Yim Tin; ii. Upgrading works of the open area in front of Yeung Hau Temple; iii. Construction of an amphitheatre-cum-open space and a public car park at Yim Tin; and iv. Ancillary works, including associated road, drainage, water mains, sewerage, utilities, landscaping and public lighting works, etc. Phase 3 works include: i. Construction of a promenade and a garden at Shek Tsai Po; ii. Construction of a footbridge to connect the proposed promenade and the existing Tai O public transport terminus; iii. Improvement to the existing helipad; iv. Provision of information and directional signage for inner loop heritage trail and outer loop nature trail; v. Improvement of existing roads and streetscape within the Tai O inner-core area; and vi. Other supporting infrastructure including refuse collection point at Shek Tsai Po, etc. Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office (Enquiry: 3842 7062) Consultant: Agreement No. CE 27/2009 (CE) – “Improvement Works at Tai O – Design and Construction” - Mannings (Asia) Consultants Limited Agreement No. CE 12/2017 (CE) – “Improvement Works at Tai O, Phase 2 Stage 2 – Design and Construction” - Meinhardt Infrastructure and Environment Limited Agreement No. CE 27/2023 (CE) – “Improvement Works at Tai O, Phase 3 – Design and Construction” - Meinhardt Infrastructure and Environment Limited Current Progress: Phase 1 Construction for the works was completed (under PWP Item 7435RO). Phase 2 Stage 1 Construction for the works was completed (under PWP Item 7469RO). Phase 2 Stage 2 Construction of the works (under PWP Item 7483RO) commenced in March 2023. The works are expected to be completed in about 3 years. Phase 3 The works are under detailed design stage. Contract: Contract No. IS/2022/01 Scope: The contract mainly comprises construction of footbridges at Yim Tin and Po Chue Tam; construction of an amphitheatre-cum-open space and a public car park at Yim Tin; upgrading works of the open area in front of Yeung Hau Temple; and ancillary works, including associated road, drainage, water mains, sewerage, utilities, landscaping and public lighting works, etc. Commencement Date: 31 March 2023 Completion Date: 2026 Awarded Sum: $286.1 million Contractor: Tung Lee-CCCC-FHDI Joint Venture Other Related Information: Phase 2 Stage 2 Gazette Date Subject 24 Dec 2021 and 31 Dec 2021 Authorization of Scheme G.N. 7975 17 Sep 2021 and 24 Sep 2021 Scheme G.N. 5670 Scheme Plans Back