CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

安達臣道石礦場用地發展

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-67.html
查看原文摘錄
Major Projects - Development of Anderson Road Quarry Site Development of Anderson Road Quarry Site Project Number: 7765L, 7803CL & 7818CL Brief Description of Project Scope: The project is to provide land and the associated infrastructures for the proposed land uses at the existing Anderson Road Quarry (ARQ) site at the north-eastern of East Kowloon according to the approved Kwun Tong (North) Outline Zoning Plan. The ARQ development site will provide about 12 hectares of land for housing development, to facilitate the population intake to commence from 2023-24 onwards. Land will also be provided for commercial uses, government, institution or community facilities, open space and amenity areas, etc. In addition to the site formation and infrastructure works within the ARQ site, a bus-to-bus interchange (BBI) will be constructed at the toll plaza of Tseung Kwan O Tunnel for public use, and to alleviate the public transport demand at Sau Mau Ping, Po Tat, Hing Tin areas as well as to mitigate the traffic impact generated from the ARQ development. A series of associated off-site road improvement works and pedestrian connectivity facilities is also proposed to enhance the pedestrian connectivity between the ARQ site and housing estates in the vicinity, the Kwun Tong town centre and the proposed BBI, as well as to mitigate the potential traffic impact arising from the proposed ARQ development. Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7096) Consultant: AECOM Asia Company Limited Approved Project Estimate: About $10.8 billion Related Website: http://www.arqs.hk Current Progress: Construction commenced in December 2016. Contract: Contract No: NE/2016/01 Scope: The works include formation of about 40 hectares of land platforms at the Anderson Road Quarry (ARQ) Site and the associated geotechnical works; road works including construction of approximately 3-kilometre long vehicular roads, footpaths, cycle tracks, an approximately 130-metre long underpass at the southern end and a public transport terminus at the northern end of the ARQ site; provision of and improvement to water supply, drainage and sewerage systems as well as landscaping works. Commencement Date: 21 December 2016 Completion Date: Early 2022 to 2023 (in phases) Contract Sum: $2,668 million Contractor: Chun Wo - STEC - Vasteam Joint Venture Contract No: NE/2016/05 Scope: The works mainly comprise the construction of pedestrian connectivity facilities with footbridges and lift towers, escalators in Kwun Tong district; a bus-to-bus interchange at Tseung Kwan O Tunnel Toll Plaza; slope improvement works in the vicinity of Po Lam Road South and other associated works. Commencement Date: 31 March 2017 Completion Date: 2020 - mid 2023 (in phases) Contract Sum: $299 million Contractor: Kwan On Construction Company Limited Contract No: NE/2017/03 Scope: The works mainly include a) road improvement works at junction of Clear Water Bay Road and On Sau Road, and at New Clear Water Bay Road near Shun Lee Tsuen Road; b) construction of a vehicular flyover from Lin Tak Road to Sau Mau Ping Road and provision of laybys at Lin Tak Road; c) construction of pedestrian connectivity facilities, including footbridges, lift towers and escalators in Kwun Tong district; d) provision of a public toilet for the proposed bus-to-bus interchange at Tseung Kwan O Tunnel Toll Plaza; and e) associated noise barriers and enclosures, slope works and landscaping works. Commencement Date: 31 May 2018 Completion Date: 2023 - 2025 (in phases) Contract Sum: $1,328 million Contractor: CW - CMGC JV Contract No: ED/2019/02 Scope: The works mainly include a) construction of an about 50 metres (m) long two-way escalator link (EL1) between Sau Mau Ping Road and the existing footbridge to Po Tat Estate; b) construction of an about 55 m long two-way escalator link (EL2) between Sau Mau Ping South Estate and the existing footbridge to Sau Mau Ping Road; c) co