CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-70.html
查看原文摘錄
Major Projects - Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works Project Number: 7804CL Brief Description of Project Scope: The project mainly comprise:- widening of a section of about 970 metres (m) long of Kam Ho Road between Kam Tin Road and Tung Wui Road from a single two-lane carriageway to a dual two-lane carriageway, including construction of a bridge of about 95 m long across Kam Tin River; widening of a section of about 360 m long of eastbound Kam Tin Road between Ko Po Tsuen and Kam Ho Road from a two-lane to three-lane carriageway; provision of four bus laybys along Kam Sheung Road; construction of sewers along Tung Wui Road, Kam Ho Road and Kam Tai Road; road junction improvement at Kam Tin Road/Kam Tin Bypass/Kam Ho Road, Kam Tin Road/Kam Sheung Road, Kam Ho Road/Tung Wui Road, Tung Wui Road/Kam Sheung Road, Pat Heung Road/Kam Sheung Road and Tsing Long Highway Slip Road/Pat Heung Road junctions; geotechnical, drainage, water supply, landscaping and other miscellaneous re-provisioning works; and implementation of environmental mitigation measures including construction of noise barriers at Kam Tin Road, re-provisioning of wetland near the junction of Chi Ho Road and Shui Tau Road, and an environmental monitoring and audit (EM&A) programme for the works mentioned in (a) to (f) above. Project Office in Civil Engineering and Development Department: West Development Office (Enquiry: 2158 5680) Consultant: AECOM Asia Company Limited Approved Project Estimate: $697 million Current Progress: Works commenced in July 2018. Contract: Contract No. YL/2017/01 Scope: The works mainly include road widening works at a section of Kam Ho Road and Kam Tin Road, provision of four bus laybys along Kam Sheung Road, junction improvement works at nearby junctions, sewerage, geotechnical, drainage, water supply, landscaping and other miscellaneous re-provisioning works. Commencement Date: 25 July 2018 Completion Date: Mid 2022 Contract Sum: $409 million Contractor: Sun Fook Kong (Civil) Limited Other Related Information: Gazette Date Subject 25 November 2016 & 2 December 2016 Authorization G.N. 6618 G.N. 6620 Modification Plan 60336159/GAZ1/101A (INSET A) & 104A (INSET A) 24 March 2016 & 1 April 2016 Works Scheme G.N. 1641 Scheme Plan 60336159/GAZ1/100 - 105 G.N. 1644 Scheme Plan 60336159/SGAZ/401 - 402 Back