CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Kai Tak development – 基礎設施 for developments at the former runway and south apron

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-78.html
查看原文摘錄
Major Projects - Kai Tak development – infrastructure for developments at the former runway and south apron Kai Tak development – infrastructure for developments at the former runway and south apron Project Number: 7822CL Brief Description of Project Scope: The scope of Stage 4 comprises: a.    construction of the following items of works located at the former runway – a section of dual two-lane Road D3 (Metro Park Section) (MPS) of about 1 130 metres (m) long connecting Shing Kai Road at the former north apron and Road D3A at the former runway, including about 200 m underpass with associated 320 m depressed road, 360 m elevated road and 250 m at grade road; a single two-lane Road L12d of about 47 m long connecting Road D3A at the former runway; a salt water pumping station and associated water intake; a sewage pumping station; and landscaped decks of about 380 m long in total with a minimum width of about 11 m above Road D3 (MPS) and landscaped area adjoining Road D3 (MPS) providing a total of about 3.9 hectares of public open space. The scope of Stage 5 comprises: b.    construction of the following items of works located at the former south apron – single two-lane roads of about 650 m long in total covering part of Road L10, Road L18 and Road S20; and a landscaped elevated walkway of about 140 m long, connected with the existing footbridge KF64, with associated lifts and a staircase. c.    associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping, outfalls, modification of seawall, electrical and mechanical works and ancillary works at the former runway and south apron; and d.    implementation of environmental mitigation measures and related environmental monitoring and audit (EM&A) works for the works mentioned in items (a) to (c) above. Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3579 2452) Consultant: AECOM Asia Company Limited; Hyder-Meinhardt-Joint Venture. Approved Project Estimate: $2.874 billion Current Progress: The Stage 4 works commenced on 30 May 2019 and the Stage 5 works commenced on 14 November 2019. The delivery of both stages of works is on schedule. Contract: Contract No. ED/2018/01 Scope: same as project scope for the Stage 4 above plus other miscellaneous works at the former runway Commencement Date: 30 May 2019 Completion Date: completion in phases by 2023 Contract Sum: $1.480 billion Contractor: Penta-Ocean Construction Co., Ltd. Contract No. ED/2018/04 Scope: same as project scope for the Stage 5 infrastructure above plus the project scope of 7785TH (Trunk Road T2 and Cha Kwo Ling Tunnel) Commencement Date: 14 November 2019 Completion Date: completion in phases by 2023 (for Stage 5 infrastructure) Contract Sum: $10.918 billion (for Stage 5 infrastructure and for Trunk Road T2 and Cha Kwo Ling Tunnel) Contractor: Bouygues Travaux Publics Other Related Information: Gazette Date Subject 15 March 2019 G.N. 1864 20 March 2020 G.N. 1235 25 May 2018 & 1 June 2018 Authorization of Scheme G.N. 3767 21 July 2017 & 28 July 2017 Scheme G.N. 5062 Plan(s) 60102100/D3_GAZ/101 60102100/D3_GAZ/102 60102100/D3_GAZ/103 16 March 2018 Authorization of Scheme G.N. 2014 18 August 2017 & 25 August 2017 Scheme G.N. 5996 Plan(s) CEDD/GZ7702/001 15 December 2017 & 22 December 2017 Scheme G.N. 9601 Plan(s) KM9910 25 May 2018 & 1 June 2018 Authorization of Scheme G.N. 3766 15 December 2017 & 22 December 2017 Scheme G.N. 9375 Plan(s) 60102100/D3_GAZ_421 Back