CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

東涌新市鎮擴展 - Reclamation and Advance Works

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-84.html
查看原文摘錄
Major Projects - Tung Chung New Town Extension - Reclamation and Advance Works Tung Chung New Town Extension - Reclamation and Advance Works Project Number: 7814CL Brief Description of Project Scope: The scope of the project comprises: (a) reclamation of the seabed by a non-dredged method at Tung Chung East to form a total of about 130 hectares of land; (b) construction of about 4.9 kilometres of seawalls, with an eco-shoreline, three drainage box culvert outfalls, three circulation drains and a seawater intake; (c) construction of a 470 metre long multi-cell drainage box culvert at Tung Chung East; (d) provision of infrastructure for Tung Chung Area 58, including construction of a single two-lane road with a footpath of about 270 metre in length and the associated utility works; and (e) implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned in (a) to (d) above. Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office (Enquiry: 2231 4408) Consultant: AECOM Asia Company Limited Approved Project Estimate: $20,210 million Related Website: http://www.tung-chung.hk/ Current Progress: The works commenced on 29 December 2017 and are on schedule. Contract: Contract No. NL/2017/03 Scope: Same as project scope above Commencement Date: 29 December 2017 Completion Date: 2023 Contract Sum: About $12,076 million Contractor: Build King - SCT Joint Venture Environmental Monitoring and Audit Information: http://env.tcnte.hk/ Back