CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

West Kowloon Reclamation – main works (remainder) – footbridge at the junction of Sham Mong Road and Hing Wah Street West in Sham Shui Po

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-88.html
查看原文摘錄
Major Projects - West Kowloon Reclamation – main works (remainder) – footbridge at the junction of Sham Mong Road and Hing Wah Street West in Sham Shui Po West Kowloon Reclamation – main works (remainder) – footbridge at the junction of Sham Mong Road and Hing Wah Street West in Sham Shui Po Project Number: 7831CL Brief Description of Project Scope: The scope of the project comprises: (a) a covered four-span footbridge system at the junction of Sham Mong Road and Hing Wah Street West, with the length of each span ranging from about 45 metres (m) to 58 m (222 m in total) and the clear width of about 4 m; (b) seven lifts, four covered escalators and two covered staircases linking the proposed footbridge system with the existing and future adjacent developments; (c) associated road works and ancillary works, including footpaths, drainage, utilities, electrical and mechanical and landscaping works; and (d) necessary environmental mitigation measures. Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office (Enquiry: 3842 7062) Consultant: Mott MacDonald Consultants (Hong Kong) Limited Approved Project Estimate: $331.9 million Current Progress: The works commenced on 23 July 2020 and are on schedule. Contract: Contract No. SD/2019/02 Scope: Same as project scope above. Commencement Date: 23 July 2020 Completion Date: Q3 2024 Contract Sum: About $218 million Contractor: Wang Kee Joint Venture Other Related Information: Scheme / Amendments of Scheme / Authorization of Scheme Gazette Date Subject 29 MAR 2019 and 4 APR 2019 Authorization of Scheme G.N. 2186 30 NOV 2018 and 7 DEC 2018 Scheme G.N. 8851 Scheme Plan(s) KZ1298 Back