CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Hung Shui Kiu/Ha Tsuen New Development Area - First Phase Development

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-91.html
查看原文摘錄
Major Projects - Hung Shui Kiu/Ha Tsuen New Development Area - First Phase Development Hung Shui Kiu/Ha Tsuen New Development Area - First Phase Development Project Number: 7845CL, 7796CL Brief Description of Project Scope: The project mainly comprises site formation and engineering infrastructure works to support the First Phase development of Hung Shui Kiu/Ha Tsuen New Development Area. The project is being delivered in three packages, namely Advance Works Phase 1, Advance Works Phase 2 and Stage 1 Works. Advance Works Phase 1 was implemented by CEDD Term Contract for Minor Works (Contract No. ED/2020/01) and was completed in November 2020. Project Office in Civil Engineering and Development Department: West Development Office (Enquiry: 2158 5680) Consultant: Agreement No. CE 39/2016 (CE) - Hung Shui Kiu New Development Area Advance Works, Phases 1 & 2 - Design and Construction - AECOM Asia Company Limited Agreement No. CE 56/2016 (CE) - Hung Shui Kiu New Development Area Stage 1 Works - Design and Construction - Mott MacDonald Hong Kong Limited Approved Project Estimate: Advance Works Phases 1 & 2: $279.0 million (part of 7845CL) Stage 1 Works: $1,351.2 million (7796CL) Related Website: https://www.hskhtnda.hk/en/ Current Progress: Works commenced progressively from July 2020. Contract: Contract No. YL/2019/02 - Hung Shui Kiu/Ha Tsuen New Development Area Advance Works Phase 2 - Site Formation and Engineering Infrastructure Scope: (a) site clearance and formation (including land decontamination works) for about 2.6 hectares (ha) of land, together with the provision of associated engineering infrastructure; (b) construction of local roads including a one-lane two-way carriageway of about 330 metres (m) long with passing bays connecting Tsing Yick Road to Ng Lau Road; (c) construction of about 340 m long sewer; (d) construction of about 1 500 m long water mains; and (e) implementation of environmental mitigation measures for the works mentioned above. Commencement Date: August 2020 Completion Date: December 2024 Contract Sum: about $112 million Contract No. YL/2020/03 - Hung Shui Kiu/Ha Tsuen New Development Area Stage 1 Works - Site Formation and Engineering Infrastructure Scope: (a) site clearance and formation (including land decontamination works) for about 14 hectares (ha) of land, together with the provision of associated engineering infrastructure; (b) construction of a district distributor road of about 500 metres (m) long, which will be a dual two-to-three-lane carriageway connecting to the existing interchange underneath the Kong Sham Western Highway, construction of a single two-lane local road of about 350 m long, widening of a section of Fung Kong Tsuen Road to single two-lane carriageway of about 150 m long and associated junction/road improvements; (c) construction of about 1,700 m-long sewers, about 360 m-long sewage rising mains and a sewage pumping station (including electrical and mechanical works); (d) construction of about 1,700 m-long drainage pipes and the associated detention pond; (e) construction of about 2,300 m-long water mains; and (f) implementation of environmental mitigation measures and the environmental monitoring and audit programme fo rthe works mentioned above. Commencement Date: April 2021 Completion Date: 2025 (anticipated) Contract Sum: about $445 million Contractor: Contract No. YL/2019/02 - Adrian Construction Limited Contract No. YL/2020/03 - China Geo-Engineering Corporation Other Related Information: https://www.hskhtnda.hk/en/info-centre/#document Back