CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Kai Tak development – stage 5B 基礎設施 works at the former north apron area

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-94.html
查看原文摘錄
Major Projects - Kai Tak development – stage 5B infrastructure works at the former north apron area Kai Tak development – stage 5B infrastructure works at the former north apron area Project Number: 7832CL Brief Description of Project Scope: The scope of works comprises the following major items: construction of a section of dual two-lane Road D1 of about 540 metres (m) long connecting Olympic Avenue; construction of single two-lane Road L9 and Road L16 of about 400 m long in total connecting the proposed Road D1; construction of a single-lane slip road S14 of about 210 m long linking the proposed Road D1 with the eastbound of Prince Edward Road East through the existing flyover K73; construction of a pedestrian subway SB-01 of about 120 m long across Prince Edward Road East connecting Kowloon City and the future Underground Shopping Street in Kai Tak Development; construction of an elevated walkway LW-02 of about 150 m long across Kai Tak River, connecting the existing elevated walkway adjoining the Trade and Industry Tower and a Comprehensive Development Area site located at the west of Kai Tak River; renovation of the existing pedestrian subways KS9, KS10 and KS32, as well as modification of the southern end of the existing pedestrian subway KS10; construction of associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping, electrical and mechanical works, and ancillary works; and implementation of environmental mitigation measures and related environmental monitoring and audit programme for the works. Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7107) Consultant: AECOM Asia Company Limited Approved Project Estimate: $1720 million Current Progress: The works commenced on 31 July 2020 and are on schedule. Contract: Contract No. ED/2018/05 Scope: Same as project scope above Commencement Date: 31 July 2020 Completion Date: 2025 Contract Sum: $929 million Contractor: Build King – STEC Joint Venture Other Related Information: Gazettal Documents Scheme / Amendments of Scheme / Authorization of Scheme Gazette Date Subject Stage 5 Infrastructure Works Stage 5B and Remaining Infrastructure Works 1 February 2019 & 8 February 2019 Authorization of Scheme G.N. 1014 Authorization of Scheme G.N. 1015 2 November 2018 & 9 November 2018 Amendment of Scheme G.N. 8325 Amendment of Scheme Plan(s) 60102100/GAZ/S5/1.1A 60102100/GAZ/S5/1.2A 60102100/GAZ/S5/1.3 Scheme G.N. 8324 Scheme Plan(s) 60102100/GAZ/S5/1.6 29 August 2014 & 5 September 2014 Authorization of Scheme G.N. 4935 17 April 2014 & 25 April 2014 Scheme G.N. 2235 Scheme Plan(s) 60102100/GAZ/S5/1.1 60102100/GAZ/S5/1.2 Back