Integrated Basement for West Kowloon Cultural District – third stage of construction works

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-97.html
查看原文摘錄
Major Projects - Integrated Basement for West Kowloon Cultural District – third stage of construction works Integrated Basement for West Kowloon Cultural District – third stage of construction works Project Number: 7815CL Brief Description of Project Scope: The third stage of construction works comprises – (a) construction of the remaining foundation works for Zone 3B of the integrated basement and associated environmental mitigation measures, and related environmental monitoring and auditing (EM&A) works for construction works; (b) construction of essential basement structure and associated works for Zone 3B of the integrated basement; (c) construction of an underground road of about 230 metres long in Zone 3B of the integrated basement, remaining works for the remaining section of underground road in Zone 3A of the integrated basement, and associated works including footpaths, pick-up/drop-off area, water supply, drainage, electrical and mechanical works, fire services installation works, plant rooms, and means of escape/means of access for firefighting and rescue; (d) protection works for the existing Airport Express Tunnels (AET) and associated works in Zone 3B of the integrated basement; (e) construction of about 380 metres long drainage box culvert within the essential basement structure for Zone 3B of the integrated basement; and (f) necessary environmental mitigation measures, and related EM&A works for construction works in sub-paragraphs (b) to (e) above. Cost: $3,178.4 Million Completion Date: December 2022 Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office Other Related Information: Gazettal Documents Scheme / Amendments of Scheme / Authorization of Scheme Gazette Date Subject 30 APR 2015 & 8 MAY 2015 Authorization of Scheme G.N. 3087 13 FEB 2015 & 18 FEB 2015 Scheme G.N. 1633 Scheme Plan KZ840 Back