CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

The Establishment of an Agricultural Park in Kwu Tung South (Phase 1)

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-100.html
查看原文摘錄
Major Projects - The Establishment of an Agricultural Park in Kwu Tung South (Phase 1) The Establishment of an Agricultural Park in Kwu Tung South (Phase 1) Project Number: 7473RO Brief Description of Project Scope: The scope of the project comprises: a. formation works for about 7.5 hectares (ha) of land; b. related infrastructures including drainage, sewerage, irrigation, water supply, utilities and street lighting; c. associated park facilities including basic lodging and storage units; and d. construction of about 900 metres (m) long access road and footpaths (including a culvert bridge of about 5m wide; and two vehicular bridges with associated footpaths of about 20m and 40m long respectively) connecting the existing Tsiu Keng Road. Cost: About $230 million Completion Date: June 2024 Project Office in Civil Engineering and Development Department: North Development Office (Enquiry: 3797 5387) Back