Major Projects - Development of the Loop – Main Works Package 1
Development of the Loop – Main Works Package 1
Project Number:
7760CL
Brief Description of Project Scope:
Main Works Package 1 mainly cover -
a. site clearance and formation for about 70 hectares of land within the Loop;
b. engineering infrastructure works supporting Phase 1 development of the Hong Kong-Shenzhen Innovation and Technology Park, including Western Connection Road and Direct Road Link for connection with the Loop, local roads, sewerage (including sewage treatment works), drainage, water supply and landscaping works; and
c. environmental mitigation measures and the environmental monitoring and audit programme for the works mentioned in paragraphs (a) to (b) above.
Project Office in Civil Engineering and Development Department:
West Development Office (Enquiry: 2417 6365)
Consultant:
AECOM Asia Company Limited
Current Progress:
The detailed design of site formation and infrastructure works under Main Works Package 1 of the Loop development commenced in September 2018.
The construction of site formation and infrastructure works under Main Works Package 1 of the Loop development commenced in July 2021 for expected completion in phases in around 6 years.
Other Related Information:
Gazette Date
Subject
17 Jul 2020 & 24 Jul 2020
Authorization of Scheme with Modification
G.N. 3987
Modification Plan
14 Jun 2019 & 21 Jun 2019
Scheme
G.N. 3774
Scheme
Plans
60588085/GAZ/100
60588085/GAZ/101
60588085/GAZ/102
60588085/GAZ/103
60588085/GAZ/104
60588085/GAZ/105
60588085/GAZ/106
60588085/GAZ/107
60588085/GAZ/108
60588085/GAZ/109
60588085/GAZ/110
60588085/GAZ/111