可作案卷引用

東區走廊下行人板道

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-120.html
查看原文摘錄
Major Projects - Boardwalk underneath Island Eastern Corridor Boardwalk underneath Island Eastern Corridor Project Number: 7873TH Brief Description of Project Scope: The works mainly include: (a)  construction of a boardwalk of about 2.2 kilometres (km) long and at least 10 metres (m) wide (including a passage of about 0.4 km within the existing North Point Promenade) for different users, the access points to the hinterland, viewing platforms, and fishing platform; (b)  construction of movable bridges; (c)  provision of ancillary facilities with architectural features such as shelters, glass balustrades, seating, water dispensers, toilets, kiosks, as well as a management office and a function room at Hoi Yu Street; (d)  implementation of beautification, modification and revitalisation works of existing facilities to be affected along the proposed Boardwalk, such as the North Point Promenade, Tong Shui Road Pier, North Point Vehicular Ferry Pier, Hoi Yu Street and IEC structures; (e)  implementation of associated road, drainage, sewerage, electrical and mechanical (E&M), waterworks, landscaping works and other ancillary works; and (f)   implementation of environmental mitigation measures and an environmental monitoring and audit (EM&A) programme for the works mentioned in items (a) to (e) above. Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office Consultant: Meinhardt Infrastructure and Environment Limited Approved Project Estimate: $1,682 million Related Website: https://www.boardwalk.gov.hk/en/index.html Current Progress: Works commenced in December 2021. Contract: Contract No. SD/2021/02 Commencement Date: 31 December 2021 Contract Sum: $1,181 million Contractor: IEC Boardwalk Joint Venture Other Related Information: Gazette Date Subject 9 Jul 2021 & 16 Jul 2021 Authorization of Scheme G.N. 4115 G.N. 4116 31 Dec 2020 & 8 Jan 2021 Scheme G.N. 7629 Scheme Plans 91640/D/GAZ/0001 to 91640/D/GAZ/0005 G.N. 7630 Scheme Plans 91640/D/GAZ/0011 to 91640/D/GAZ/0014 Back