CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Infrastructure works for developments at Kwun Tong Action Area

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-126.html
查看原文摘錄
Major Projects - Infrastructure works for developments at Kwun Tong Action Area Infrastructure works for developments at Kwun Tong Action Area Project Number: 7842CL Brief Description of Project Scope: The scope of the project comprises:- (a)  construction of new access roads L1 of about 120 metres (m) long and L2 of about 70 m long, and associated road modification and junction improvement works; (b)  construction of an about 50 m long covered footbridge with associated lifts and staircases across Wai Yip Street to connect Hoi Yuen Road and KTAA; (c)  modification of an existing public transport interchange; (d)  reconfiguration of Kwun Tong Vehicular Ferry Pier (KTVFP) and the associated dangerous goods vehicular (DGV) queuing area; (e)  provision of the adjoining waterfront promenade and open space; (f)  carrying out associated demolition and site formation, drainage, sewerage, waterworks, landscaping, electrical and street lighting works, utilities and other ancillary works; and (g)  implementation of environmental mitigation measures for the proposed works. Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 3842 7149) Consultant: Atkins China Limited Other Related Information: Gazette Date Subject 4 June 2021 & 11 June 2021 Scheme G.N. 3343 Scheme Plan 5193437-GAZ-1001 G.N. 3344 Scheme Plan 5193437-GAZ-2001 Back