CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Site Formation and Infrastructure Works for Public Housing Development at Cha Kwo Ling Village, Kowloon East

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-137.html
查看原文摘錄
Major Projects - Site Formation and Infrastructure Works for Public Housing Development at Cha Kwo Ling Village, Kowloon East Site Formation and Infrastructure Works for Public Housing Development at Cha Kwo Ling Village, Kowloon East Project Number: 7849CL Brief Description of Project Scope: The public housing development at Cha Kwo Ling Village will provide about 4,500 public housing units to accommodate about 12,600 people. The Civil Engineering and Development Department will carry out site formation and infrastructure works for the development including the construction of a carriageway cum footpaths to connect Ko Ling Road and Cha Kwo Ling Road, a pedestrian link, relevant road improvement works and slope works. This project will involve land resumption and clearance. Regarding the proposed land resumption and clearance limit, please refer to the plans below. Proposed land resumption and clearance limit Project Office in Civil Engineering and Development Department: South Development and Sustainable Lantau Office (Enquiry: 3842 7062) Consultant: AECOM Asia Co. Ltd. Approved Project Estimate: $1,046 million Status: The construction contracts for Phase 1 works and Phase 2 works commenced in July 2023 and March 2025 respectively. Contract: Contract No. SD/2022/02 Scope: The Phase 1 works mainly include site formation works of land platform with a total area of about 1 ha. They will be carried out together with site formation and infrastructure works for the development of ex-Cha Kwo Ling Kaolin Mine Site (Phase 2). Commencement Date: 31 July 2023 Completion Date: 2027 Contract Sum: About $680 million Contractor: Vibro Joint Venture Contract No. SD/2024/02 Scope: The Phase 2 works mainly include site formation works of land platform with a total area of about 7.9 ha, the construction of a carriageway cum footpaths to connect Ko Ling Road and Cha Kwo Ling Road, a pedestrian link, road improvement works and ancillary works including drainage works, sewerage works, waterworks and roadside greening works. Commencement Date: 28 March 2025 Completion Date: 2029 Contract Sum: About $668 million Contractor: Sang Hing - Tapbo Joint Venture Other Related Information: Scheme / Amendments of Scheme / Authorization of Scheme Gazette Date Subject 24 Jun 2022 & 30 Jun 2022 Authorization of Scheme G.N. 3092 25 Mar 2022 & 01 Apr 2022 Scheme G.N. 1403 Scheme Plans GAZ/100_to_104 Back