查看原文摘錄
Major Projects - Trunk Road T4 in Sha Tin
Trunk Road T4 in Sha Tin
Project Number:
7705TH
Brief Description of Project Scope:
The works mainly include:
construction of a dual two-lane trunk road of approximately 2.3 kilometers in length with slip roads connecting Shing Mun Tunnel Road/Tsing Sha Highway and Sha Tin Road;
widening of a section of Sha Tin Road near Pok Hong Estate of approximately 150 meters in length, from a dual two-lane carriageway to a dual four-lane carriageway;
construction of three elevated footpaths across Che Kung Miu Road, Shing Mun River Channel and the proposed trunk road near Sha Tin Tau Village respectively, and one elevated footpath cum cycle track across Lion Rock Tunnel Road for reprovisioning of existing pedestrian and cycling facilities affected by the project;
ancillary works including civil, geotechnical, drainage, sewerage, water, utilities, lighting, landscaping, electrical and mechanical works, construction/reconstruction/demolition of noise barriers, construction of retaining walls and slope improvement works; and
implementation of environmental mitigation measures and environmental monitoring and audit programme.
Project Office in Civil Engineering and Development Department:
East Development Office (Enquiry: 3842 7098)
Consultant:
AECOM Asia Company Limited
Approved Project Estimate:
$6,810 million
Related Website:
https://www.trunkroadt4.hk/en/
Status:
Under construction
Current Progress:
The works commenced on 26 August 2024.
Contract:
Contract No. ED/2022/02
Commencement Date:
26 August 2024
Completion Date:
2030
Contract Sum:
$6,083.6 million
Contractor:
CRBC - Build King Joint Venture
Other Related Information:
Gazette Date
16 December 2022 and
23 December 2022
26 November 2021 and
3 December 2021
Subject
Authorisation of Scheme
G.N. 7185
Scheme (Road Works)
G.N. 7314
-
Scheme
-
Plan No. 60579757/GAZ/100-106
-
Plan No. STM10485 (Sheet 1 to 4)
-
Plan No. STM10495
-
Plan No. STM10502
Back