CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Joint Cavern 安達臣道發展 Quarry Site -

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-150.html
查看原文摘錄
Major Projects - Joint Cavern Development at Anderson Road Quarry Site - Joint Cavern Development at Anderson Road Quarry Site - Project Number: 7851CL & 5792CL Brief Description of Project Scope: 7851CL - Relocation of Public Works Central Laboratory to caverns The scope of 7851CL comprise – (a) construction of a cavern complex and connection adits of about 6 000 square metres (m 2 ) in area and about 160 000 cubic metres in total volume inside the mountain body of Tai Sheung Tok at the Anderson Road Quarry Development site; (b) construction of a 3-storey Public Works Central Laboratory (PWCL) inside caverns and at the portal (about 2 000 m 2 in site area), including its structure and foundation, building services as well as furniture and equipment; (c) demolition of the existing PWCL Building in Kowloon Bay; and (d) other related works, including landscaping works. 5792CL - Building of Government Records Service's Archives Centre in caverns The scope of 5792CL comprise – (a) construction of a cavern complex and connection adits of about 6 500 square metres (m 2 ) in area and about 190 000 cubic metres in total volume inside the mountain body of Tai Sheung Tok at the Anderson Road Quarry Development site; (b) construction of a 3-storey Archives Centre inside caverns and a 4-storey building at the portal (about 2 000 m 2 in site area), including its structure and foundation, building services, automated storage and retrieval systems as well as furniture and equipment; and (c) other related works, including landscaping works. Project Office in Civil Engineering and Development Department: Geotechnical Engineering Office (Enquiry: 2760 5780) Consultant: AECOM Asia Company Limited Approved Project Estimate: About $2.16 billion (7851CL) About $2.77 billion (5792CL) Related Website: https://www.arqcavern.hk/ Current Progress: The works commenced on 10 July 2023. Contract: Contract No. GE/2022/14 Scope: The scope of works of the contract comprises the design and construction of caverns, adits and portals and the structural and architectural elements, both on surface land and within caverns, for reprovisioning of Public Works Central Laboratory ("PWCL") and building of Government Records Service's new Archives Centre at Anderson Road Quarry site, and the subsequent demolition of the existing PWCL Building in Kowloon Bay. Commencement Date: 10 July 2023 Completion Date: July 2028 Contractor: China State - Alchmex Joint Venture Other Related Information: https://www.arqcavern.hk/en-us/project-background Back