Major Projects - Site Formation and Infrastructure Works for Public Housing Developments at San Hing Road and Hong Po Road, Tuen Mun
Site Formation and Infrastructure Works for Public Housing Developments at San Hing Road and Hong Po Road, Tuen Mun
Project Number:
B764CL and B861CL
Brief Description of Project Scope:
The scope of the project comprises:
(i) site formation works including site clearance and land decontamination works, if required;
(ii) geotechnical works including slope works, retaining structures and natural terrain hazard mitigation measures, if required;
(iii) roadworks including realigned Hong Po Road, Road L7, extension of the footbridge near Ng Lau Road and two public transport interchanges etc.;
(iv) sewerage works including a sewage pumping station;
(v) drainage works;
(vi) waterworks;
(vii) associated tree felling, transplanting and preservation works; and
(viii) ancillary works including environmental mitigation measures, landscaping works and archaeological works including archaeological field survey and mitigation measures, if required etc.
Project Office in Civil Engineering and Development Department:
Housing Projects Division, Civil Engineering Office
Consultant:
AtkinsRealis Asia Limited
Current Progress:
Investigation and design works commenced in December 2021.
Other Related Information:
Gazette Date
Subject
21 March 2025
Authorization of Road Works
G.N.1614
Modification Plans
MP-01 and MP-02
21 March 2025
Authorization of Sewerage Works
G.N.1613
26 January 2024
Scheme of Road Works
G.N.394
Scheme
Plans
5208968-SHHP-GAZ-1000 to 5208968-SHHP-GAZ-1005
TMM4450
Location Plan
26 January 2024
Scheme of Sewerage Works
G.N.395
Scheme
Plans
5208968-SHHP-GAZ-1010 to 5208968-SHHP-GAZ-1013
26 January 2024
Proposal for Land Resumption
G.N.493
Plans
TMM4453_1
TMM4453_2