CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

掃管埔交匯處改善工程

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-176.html
查看原文摘錄
Major Projects - Improvement to So Kwun Po Interchange Improvement to So Kwun Po Interchange Project Number: 7086TI Brief Description of Project Scope: The works mainly comprise:- construction of north-south link road of about 700m connecting Pak Wo Road and San Wan Road; reconstruction of sections of So Kwun Po Road near North District Park; widening of the north-western slip road from So Kwun Po Road to San Wan Road; reconstruction and realignment of So Kwun Po Road between Kai Leng Roundabout and Pak Wo Road; improvement works at the junction of San Wan Road and the proposed north-south link road; improvement works at the junction of Pak Wo Road and So Kwun Po Road; construction of a lift and a staircase linking San Wan Road and elevated So Kwun Po Road; construction of a pedestrian subway across So Kwun Po Road near Pak Wo Road; re-provision of the roller skating rink within North District Park affected by the road works; and associated works including geotechnical, landscape, drainage, water, installation of noise barriers, electrical and mechanical, environmental mitigations, street lighting and utilities works, as well as installation of street furniture and traffic aids. Project Office in Civil Engineering and Development Department: North Development Office Consultant: WSP (Asia) Limited Current Progress: Investigation and design works commenced in September 2021. Other Related Information: Gazette Date Subject 07 June 2024 and 14 June 2024 Authorization of Scheme G.N. 3225 25 August 2023 and 1 September 2023 Scheme G.N. 4998 Scheme Plan(s) CE1/GZ/000 to CE1/GZ/003 Back