CEDD 立法會上會準備系統

公開證據與 CEDD 上會準備

案卷引用判斷

可作案卷引用

Kai Tak development – stage 1 基礎設施 works at north apron area of Kai Tak Airport

CEDD 官方項目 官方來源 CEDD 官方項目

使用邊界

只引用已核實公開內容;未公開事項會後補充。

查看來源與原文存檔
查看官方來源 原文存檔:data/raw/cedd_major_projects/index-id-4.html
查看原文摘錄
Major Projects - Kai Tak development – stage 1 infrastructure works at north apron area of Kai Tak Airport Kai Tak development – stage 1 infrastructure works at north apron area of Kai Tak Airport Project Number: 7739CL Brief Description of Project Scope: construction of about 2.6 km of new roads, realignment of Concorde Road, extension and widening of Kai Wah Street, temporary and permanent closure of existing roads within the north apron, and associated drainage, sewerage and water mains; construction of two footbridges (FB1 and FB4) of total length of about 260 m and improvement works to 3 existing subways (SW1, SW3 and SW5) across Prince Edward Road East; construction of 2 drainage box culverts of total length of about 600m; associated landscaping works; and provision of necessary environmental mitigation measures and implementation of an environmental monitoring and audit programme associated with the above works. Cost: $566.5 million Completion Date: December 2013 Project Office in Civil Engineering and Development Department: East Development Office (Enquiry: 2301 1393) Back